Construction Updates

ELEMENTARY UPDATES

 
Elementary School Roofing  (11.13.2025)

Caps for the new roof have been installed on the perimeter.  Inspections will take place once the roof install is complete.

elroof-1.png

AUTO MECHANICS FACILITY

MHS Auto Mechanics Facility (11.13.2025)

 

Site work has begun.  Waterlines connecting to the new fire hydrant are in place.

autoshop-1.png

MCGREGOR HIGH SCHOOL 

MHS Gym (11.13.2025)

Gym exterior walls are set and being prepped for masonry.  The locker room area will be completed soon.  Framing for hallways is taking place.

hsgym-1.png
hsgym-2.png
hsgym-3.png
hsgym-4.png

JUNIOR HIGH SCHOOL

 
Entrances & Interior (11.13.2025)

Concrete has been poured for the foundation and parking lots.  Framing and roof are almost complete for the front addition of the school.  Framing at the back entrance is moving fast.  The band hall, stage, and cafeteria areas are now ready for concrete.  The front stairwell construction will begin soon.

jh-1.png
jhfront-3.png
jh-back-4.png
jh-cafe-5.png
jhhall-2.png
jh-back-6.png

MISD AGRICULTURAL FACILITY  

Agricultural Facility (11.13.2025)
 
 

There are a few areas left to address at the new Ag Facility.  The right and left wings are complete.

ag-ctr3.png
agctr-4.png
ag-classrm-6.png
ag-hall2.png
ag-wing5.png
ag-showring.png